Nicosia Flight Control Centre operations resume following ceiling collapse

Click For Larger Image & Read More
Nicosia Flight Control Centre operations resume...
 © In-Cyprus 2019
Operations at the Nicosia Flight Control Centre have resumed completely, after the repair of the building’s ceiling which collapsed on Thursday injuring an employee.

“Control of air traffic in the airspace of the Republic of Cyprus is continuing without interruption and with no problems,” a Transport Ministry announcement said.

It said that reassurances were given to employees of the Centre, that problems with the building will be resolved.

According to philenews, air traffic control operators have been expressing concerns about the safety of the...


This article was automatically added to our system 15-6-2019

Nicosia Flight Control Centre operations resume following ceiling collapse


The contents of this article including any associated images are © In-Cyprus 2019
Views & opinions expressed in this article are those of the author and/or In-Cyprus .

  • Click Here
Advertise Here

  Trending Cyprus News

  • Click Here
Advertise Here

Article Tags: nicosia, flight, control, centre, operations, resume, following, ceiling, collapse,